Boiler Installation, HRSG, ACC, Generator, Turbine, Steam Drum, Duct, Induced-draft Fan, Dustcatcher Equipment, Desulfurizing Equipment, Stack, Turbine Generator System Erection, Feed Water Tank, Pure Water Production Equipment, Cold Generation Plant & Power Plant (including Full Construction, Commissioning, and Operating Assistance)
Ms. Cora Wang/Sales Engineer
cora@wanchi.com.tw
Tel +886 7 6163881 ext. 133
Fax +886 7 6162955