Power Plant |
2018 |
Jin Zung Lien Co., Ltd (漢科) |
WC18036 |
Unit 4 Air Filter house of TPC Hsin-Ta Power Plant Dismantling, fabrication and installation work(興達火力電廠四號)
|
1 lot |
Power Plant |
2018 |
GE POWER |
WC18033 |
High-pressure piping replacement project for Haihu Power Plant Unit-1
|
1 lot |
Power Plant |
2018 |
GE POWER |
WC18030 |
High-pressure steam piping removal Project for Haihu Power Plant Unit-1 |
1 lot |
Power Plant |
2018 |
SEO KOATSU KOGYO CO.,LTD (Japan) |
WC18025 |
Fabrication of deaerator to Japan Sumitomo Heavy Industries, Ltd. (ASME U stamp)
Fab. Comply with: Japan Electricity Business Act |
1 set |
Power Plant |
2018 |
Jin Zung Lien Co., Ltd (漢科) |
WC18021 |
Unit 3 Air Filter house of TPC Hsin-Ta Power Plant
Dismantling, fabrication and installation work (興達火力電廠三號)
|
3 sets |
Power Plant |
2018 |
Toshiba Japan |
WC18009 |
Piping fabrication for Jimah Power Plant Unit-2 to Malaysia |
CS:1290 DB SS:822 DB |
Power Plant |
2018 |
CTCI |
WC18005 |
Duct and Handrail Installation for Talin Power Plant |
1 lot |
Power Plant |
2018 |
Jin Zung Lien Co., Ltd (漢科) |
WC18003/ WC18044 |
Unit 3 Air Filter house of TPC Nan-Pu Power Plant
Dismantling, fabrication and installation work(南部火力發電廠三號) |
1 lot |
Power Plant |
2017 |
Mitsubishi Corp. |
WC17057 |
Modification of 317L for Linkou Powe Plant Unit-3 Project |
1 lot |
Power Plant |
2017 |
GE POWER |
WC17056 |
Manpower Supply for material handling and receiving at jobsite |
1 lot |
Power Plant |
2017 |
Toshiba Japan |
WC17053 |
Piping fabrication for Jimah Power Plant Unit-1 to Malaysia |
3300 DB |
Power Plant |
2017 |
Mitsubishi Corp. |
WC17048 |
Welding repair and welding work for Duplex Material for Linkou Power Plant Unit-2 Project |
1 lot |
Power Plant |
2017 |
Mitsubishi Corp. |
WC17046 |
Piping pre-fabrication P91 material for Linkou Power Plant |
1 lot |
Power Plant |
2017 |
Jin Zung Lien Co., Ltd (漢科) |
WC17045 |
Unit 2 Air Filter House of TPC Hing-Ta Power Plant
Dismantling, fabrication and installation work for
(興達火力電廠二號)
|
3 sets |
Power Plant |
2017 |
Jin Zung Lien Co., Ltd (金中聯) |
WC17026/ WC17039 |
Unit 1 Air Filter house of TPC Nan-Pu Power Plant
Dismantling, fabrication and installation work
(南部火力發電廠一號) |
1 lot |
Power Plant |
2017 |
Jin Zung Lien Co., Ltd (漢科) |
WC17031/ WC17038 |
Unit 1 Air Filter house of TPC Hsin-Ta Power Plant
Dismantling, fabrication and installation work
(興達火力電廠一號) |
1 lot |
Power Plant |
2017 |
Yo-Sheng ( 侑伸) |
WC17037 |
Fabrication of tank for galvanized coating factory |
1 set |
Power Plant |
2017 |
Toshiba Japan |
WC17035 |
Main cooling water piping prefabrication work for Jimah East Power 2 in Malaysia (Unit-2)
|
1 lot (18 sets) |
Power Plant |
2017 |
SEO KOATSU KOGYO CO.,LTD (Japan) |
WC17034 |
Supply of Deaerator for Summit Salata Power Corp. (Japan)
Fab. Comply with: Japan Electricity Business Act |
1 set |
Power Plant |
2017 |
CTCI |
WC17032 |
Unit-2 Duct fabrication of Talin Power Plant
|
1 lot |
Power Plant |
2017 |
CTCI |
WC17025 |
High pressure turbine valve replacemen at Linkou Power Plant
|
1 lot |
Power Plant |
2017 |
CPC |
WC17023 |
Repair of CO-Boiler casing of Talin Plant
|
1 set |
Power Plant |
2017 |
CPC |
WC17022 |
E-1415A/B/C/D Heat Exchanger (4 Sets) Supply to CPC Linyuan
|
4 sets |
Power Plant |
2017 |
GE POWER |
WC17021 |
Fabrrication and Repairing of 4 inch pipeline for exsiting Power Plant
|
1 lot |
Power Plant |
2017 |
GE POWER |
WC17014 |
Steam Piping Fabrication and Site Replacement Work for Changsheng Haihu Power Plant
|
1 lot |
Power Plant |
2017 |
Jin Zung Lien Co., Ltd (金中聯) |
WC17013 |
Fabrication of cooling water frame for Nan-Pu Power Plant, Taiwan (南部火力發電廠)
|
1 lot |
Power Plant |
2017 |
SEO KOATSU KOGYO CO.,LTD (Japan) |
WC17012 |
Fabrication of deaerator to Japan Sumitomo Heavy Industries, Ltd. (ASME U stamp) (SA 516 Gr. 70)
Fab. Comply with: Japan Electricity Business Act |
1 set |
Power Plant |
2017 |
CTCI |
WC17007 |
Supply of pressure parts for Unit 3 for TPC Linkou project 800 MW
|
1 lot |
Power Plant |
2016/ 2017 |
Jin Zung Lien Co., Ltd (漢科) |
WC16037/ WC17003 |
Unit 6 Air Filter house of TPC Tung Hsiao Power Plant
Dismantling, fabrication & installation work
(通霄電廠六號) |
1 lot |
Power Plant |
2016 |
Toshiba Japan |
WC16039 |
Main cooling water piping prefabrication work for Jimah East Power 2 in Malaysia (Unit-1)
|
1 lot (18 sets) |
Power Plant |
2016 |
Futai |
WC16030 |
Fabrication and Construction of Heater and auxiliary equipment for NO. 12 KHDS for CPC Talin plant project
|
2 sets |
Power Plant |
2016 |
SEO KOATSU KOGYO CO.,LTD (Japan) |
WC16029 |
Fabrication of deaerator to Japan Sumitomo Heavy Industries, Ltd. (ASME U stamp)(SA 516 Gr. 70)
Fab. Comply with: Japan Electricity Business Act |
1 set |
Power Plant |
2016 |
CTCI |
WC16027 |
Steel structure for Unit 3 for TPC Linkou project 800 MW
|
1 lot |
Power Plant |
2016 |
Jin Zung Lien Co., Ltd (漢科) |
WC16021/ WC16036 |
Unit 2 Air Filter house of TPC Nan-Pu Power Plant
Dismantling, fabrication and installation work
(南部火力發電廠二號) |
1 lot |
Power Plant |
2016 |
GE POWER |
WC16016 |
Steel structure for Unit 3 for TPC Linkou project 800 MW
|
1 lot |
Power Plant |
2016 |
Organo |
WC16003 |
Piping for Condenser for TPC Linkou project 800 MW
|
Piping for Condenser |
Power Plant |
2015 |
Dresser-Rand Asia Pacific Sdn Bhd (Malaysia) |
WC15036 |
Supply of Pulsation Bottles for CPC Talin Plant (ASME U stamp) (SA 516 Gr. 70N)
|
18 sets |
Power Plant |
2015 |
CTCI |
WC15011 |
HRSG installation for Tung Hsiao Power Plant, Taiwan
|
1 lot |
Power Plant |
2014 |
San Tai Machinery |
WC14033 |
Supply of Circulating water pipings for Tung Hsiao Power Plant
|
6 sets |
Power Plant |
2014 |
Sumitomo Corp.(Toshiba) |
WC14025/ WC14029 |
Condenser and Piping Installation for TPC Talin Thermal Power Plant 800 MW x 2 Units.
|
1664 Tons |
Power Plant |
2014 |
Mitsubishi Corp. |
WC14024/ WC14030 |
Supply of Circulating water pipings & Tanks for Tung Hsiao Power Plant
|
3 sets |
Power Plant |
2014 |
Alstom, Beijing |
WC14022 |
Supply and Fabrication of Short Pipe Spools in C276 Nickle Alloy materials
|
1 Lot |
Power Plant |
2014 |
Mitsubishi Corp. |
WC14020 |
Supply of Ammonia Injection Grid of TPC Linkou project 800 MW
|
1 lot |
Power Plant |
2014 |
CTCI |
WC14016 |
Carbon Steel Vessels for Tung Hsiao Power Plant
|
10 sets |
Power Plant |
2014 |
IHI |
WC14015 |
Supply of Steam Coil Air Heater Drain Tank and Boiler Blowdown Tank for UNIT 1 & Unit 2 for Talin Power Plant Renewal Project at Talin, Taiwan (SA 516 Gr. 70)
|
6 sets |
Power Plant |
2014 |
CTCI/CPC |
WC14011 |
Duct for AQCS area and GGH erection for CPC Talin No.10 SRU ( Sulfur Recovery Unit) Plant
|
1 lot |
Power Plant |
2014 |
Sumitomo Corp.(Toshiba) |
WC14005 |
Detail Design and supply of BFP gland drain tank, LP heater drain tank and service water head tank for TPC Talin Thermal Power Plant 800 MW x 2 Units. (SA 285 Gr.C)
|
6 sets |
Power Plant |
2014 |
IHI |
WC13039/ WC14015 |
Miscellaneous piping prefabrication and supply of steam coil air heater drain tank and boiler blowdown tank for TPC Talin Thermal Power Plant 800 MW x 2 Units
|
1 lot |
Power Plant |
2014 |
Alstom (GE Group) |
WC13008/ WC13036 |
Supply of duct work, piping and breaching for seawater FGD Package of TPC Talin Thermal Power Plant, 800MW x2 Units
(inclusive of A588 /A242/ B575 C276 clad based) |
1 lot |